Bathroom 9 Before Obect:- To remove existing suite and tiles, replaster walls and ceiling and install new suite into new positions. To fit low voltage sunken eyeball spots into ceiling and fit wall extractor into existing vent. To fit electric shower, new radiator and mirror with lights and fully tile. To remove existing secondary doorway brickwork and remove airing cupboard doors constructing new framework and fit new doos to match units.
Bathroom 9 During Photograph shows state of walls after original plaster work fell off during removal of tiles.
Bathroom 9 After Photograph shows finnished bathroom with shower bath screen folded back. A second 4 panel folding screen was fitted to the other side of the bath to protect the window.
Bathroom 9 Before The next three photographs show the same view from start through to finnish.
Bathroom 9 After Bathroom Fittings:- Balterly Dio Back to Wall Pan and Semi Recessed Basin. Ideal Standard Offset Space Shower Bath and Shower Screen. Diamond Range of Bathroom Furniture. Bristan Omega Bath and Basin Taps. Bristan Omega Accessories. Triton Aspirante Electric Shower Heater
Bathroom 9 During Photograph shows alteration to brick work to side of airing cupboard prior to re-plastering. The original loft hatch was altered to accomodate new facia.
Bathroom 9 After Photograph Shows finished view of airing cupboard with new top and bottom doors fitted to match rest of bathroom furniture.