 | (a) Bathroom 13 Before
 
Object:- To remove existing master bathroom suite and seperate wc suite, take down existing dividing walls, remove existing chipboard flooring and replace with new tongue and groove. Construct new studded walls to form new bedoom with en-suite and new bathroom.
Photo shows wc prior to converting into new bathroom.
|
|
 |
|
 |
|
 |
|
 |
|
 |
 | (f) Bathroom 13 During Photo shows construction of dividing wall between new bathroom and en-suite bathroom. The existing plasterwork was found to be perished, necessatating in its removal. New tongue and groove floor boards now replace the old perished chipboard.
|
|
 |
|
 |
 | (h) Bathroom 13 During Photo shows bathroom with suite installed and part way through being tiled. (same view as (a)).
|
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |